Big Island Hawaiʻi coastline — lush cliffs meeting the Pacific Ocean
Licensed Professional Engineer · Hawaii · Oregon · California

Engineering Solutions

Protecting Hawaiʻi's Land & Water for Future Generations

Serving the Kona Corridor with professional IWS design, cesspool conversion, and environmental site planning, from the initial evaluation through final DOH certification. One engineer, working directly with you.

Licensed PE in 3 States
12+ Years Engineering
Located in Kona
Direct Engineer Access
Engineered Septic Solutions
Why Engineered Septic Solutions
"I put down roots in this community because I wanted to be closer to family and friends, and to do work that matters to the people around me. When I help a Kona property owner take care of their wastewater, it isn't just professional service; it's one neighbor looking out for another, and for all the generations who will call this island home after us."

— Matthew Jaroslawski, PE, Founder, Engineered Septic Solutions, Holualoa, Hawaiʻi

Meet Matthew →
12+Years Wastewater
Engineering
3State PE
Licenses
2050Act 125
Deadline
1Engineer Working
With You
What We Do

Environmental Engineering Services
for the Kona Corridor

Every project managed by a licensed PE who handles the DOH permitting process on your behalf, from the first site visit to the final approval letter.

Service 01

Residential & Commercial
IWS Design

An Individual Wastewater System (IWS) is Hawaii's term for an engineered on-site septic or aerobic treatment system. Whether building a new home or developing commercial property, a licensed PE must design and permit your IWS with the State DOH Wastewater Branch.

  • Site evaluation and soil investigation
  • System type selection: anaerobic, aerobic, or alternative
  • Full PE-stamped engineered design plans
  • DOH Wastewater Branch submittal & review management
§Governed by HAR Chapter 11-62 · Submittal via wastewater.ehawaii.gov
Request IWS Design Quote →
Service 02

Cesspool Conversion
to IWS

Under Hawaii Act 125 (2017), codified in HRS §342D-72, requires every cesspool in the state to be upgraded by January 1, 2050. Cesspools discharge untreated waste directly into the soil with zero treatment, threatening the drinking water aquifers and nearshore reefs our community depends on.

Converting your cesspool is one of the most meaningful environmental contributions a Kona property owner can make.

  • Full DOH Wastewater Branch permitting
  • IWS type selection: septic, aerobic, or alternative
  • Construction oversight and final DOH certification
Start My Cesspool Conversion →
Septic tank installation in progress — concrete tank set in trench with green risers and PVC inlet pipe, excavator and surveying equipment on site

More Services

Percolation test hole with surveying rod — field soil evaluation for IWS design per HAR Chapter 11-62 Service 03

Percolation Test Supervision

Professional perc testing per HAR Chapter 11-62, Appendix C. Required for all new IWS designs.

Learn More →
Licensed engineer with clipboard reviewing septic installation with homeowners at a residential construction site Service 04

Construction Inspection & Certification

On-site inspections and obtainment of the DOH Approval to Use letter for your completed system.

Learn More →
Act 125 / 2017 — State of Hawaiʻi

Hawaiʻi's Cesspools Must Be Converted by 2050

Under HRS §342D-72, every cesspool in the state must be upgraded to an Individual Wastewater System or connected to sewer. This requirement is not just a legal obligation; it is a responsibility to our community and our island.

  • Cesspools discharge untreated sewage directly into the soil, threatening the drinking water aquifers our community depends on
  • Hawaii has more cesspools per capita than any other state, collectively discharging millions of gallons of waste daily
  • Kona's nearshore reefs and ocean ecosystem are directly impacted by inadequately treated wastewater
Start Your Cesspool Conversion →

Matthew manages all DOH permitting, design, and construction oversight.

Hawaii Session Laws
Act 125 / 2017
HRS §342D-72
Statewide Conversion Deadline
January 1,
2050
Convert first if:
Adding bedrooms · New construction · Within 200 ft of a water body
How It Works

From First Contact to DOH Approval

When you work with ESS, you're working with a neighbor. Someone who lives in this community, whose family and friends depend on the same water table, and who has a personal stake in getting your project right. There are no project managers or hand-offs here. When you have a question, you speak directly with Matthew.

01
Initial Contact
Project Inquiry & Consultation

Submit your project inquiry. Matthew reviews your property details and follows up within 3–5 business days.

Your role: Complete the inquiry form. Matthew handles all follow-up.
02
Site Work
Site Evaluation & Feasibility Assessment

Matthew visits your property to assess topography, soil, groundwater, setbacks, and feasibility, then recommends the right IWS for your site.

Your role: Grant property access. Matthew prepares the full evaluation.
03
Engineering & Permitting
IWS Design, DOH Submittal & Plan Approval

Matthew prepares complete PE-stamped design plans and manages all DOH Wastewater Branch communications, responding to comments, tracking status, and securing plan approval.

Your role: Sign the owner application. Matthew handles everything with DOH.
07
Final Certification
Construction Inspection & DOH Approval to Use

Matthew inspects the completed installation and files the final Construction Inspection Report. Once DOH issues your Approval to Use letter, your IWS is certified.

Project complete. Matthew delivers your DOH Approval to Use letter.
Matthew Jaroslawski, PE — Engineered Septic Solutions, Kailua-Kona
12+Years
Engineering
3Active PE
Licenses
About the Engineer
Matthew Jaroslawski
Founder & Principal Engineer
HI OR CA PE Licensed

Matthew Jaroslawski is a licensed Professional Engineer with over 12 years of dedicated wastewater engineering experience, spanning collection systems, treatment infrastructure, and individual wastewater system design across multiple states.

Based in Holualoa on the Big Island, Matthew founded Engineered Septic Solutions to bring PE-stamped IWS engineering directly to the Kona community, without the hand-offs or delays that come with a larger firm.

  • B.S. Civil Engineering, Cal Poly Pomona
  • 12+ Years Wastewater Engineering Experience
  • HAR Chapter 11-62, IWS Design and DOH Permitting
  • Site Evaluation, Perc Testing & Construction Inspection

"I'm not here to close a deal and move on. I'm here to serve my family, friends, and community, and do work that I'm proud to leave behind. When your system is certified and your water is clean, that matters to me, not just professionally, but as your neighbor."

Work With Matthew →
Start Your Project

Ready to Protect
Your Property &
Our Island?

Your neighbor. Your engineer. Here for the long run.

Matthew lives in this community alongside his family and friends. He plans to be in Kona for a long time. Reach out and he will follow up personally within 3–5 business days, ready to talk through your project and find the right path forward.

Response in 3–5 business days
Hawaii Licensed PE
No commitment required
What happens next
1
Submit your inquiry: describe your property and project using the form below
2
Matthew reviews and responds personally, within 3–5 business days
3
Site visit and proposal: no obligation until you decide to move forward
Get in Touch

We'd Love to Hear About Your Project

Matthew is a neighbor in this community, not just a service provider. Whether you're planning new construction, navigating a cesspool conversion, or just starting to understand your options, reach out. This is exactly the kind of conversation he is here for.

Kailua-Kona, Hawaiʻi Island
Serving Kona, Holualoa & Waikoloa
Response within 3–5 business days
Matthew Jaroslawski, PE
Hawaii · Oregon · California

No commitment required. Matthew lives here and plans to for a long time. There is no pressure to decide anything quickly. The inquiry form simply helps him understand your situation before he follows up, so your first conversation is useful from the start.

Regulatory References
HAR Chapter 11-62 — Wastewater Systems
Act 125 / 2017 — HRS §342D-72 Cesspool Mandate
DOH Wastewater Branch — State of Hawaii
Project Inquiry

Fields marked * are required.

Contact Information
Property Information
Project Details
Existing System & Timeline

By submitting this form you consent to being contacted regarding your project inquiry. Your information will not be shared with third parties.